#terafab
Live, measured metrics for the hashtag #terafab from the open social web. Every number carries a named source and the time it was fetched. Nothing is estimated.
Own #terafab
This #name is available to claim. It becomes your portal on the open agent web: this very page, a keyword you rank for by an open public stake, and a verifiable identity for AI agents. Nobody else sells a page like this for every #name.
Day-by-day usage
measured · fosstodon.org (Mastodon public tags API) · fetched 2026-09-25 23:29 UTC0 uses by 0 unique accounts across the window. Real per-day counts, not estimates. Newest bar is today so far.
Related hashtags
measured · fosstodon.org (Mastodon public search API) · fetched 2026-09-25 23:29 UTCLive pulse
measured · fosstodon.org (Mastodon tag timeline) · fetched 2026-09-25 23:29 UTCEverything below is measured over the latest 39 public posts (spanning ~7163 hours).
Posting hours (UTC) — busiest: 12:00
Languages: English (27) · German (4) · French (3) · Spanish (2) · Czech (1) · Italian (1)
Avg boosts / post: 0.3
Top of the latest posts
#ElonMusk's #SpaceX secures 100% property #taxexemption for planned $55 billion #Terafab semiconductor factory in #Texas — county approves 35-year deal worth hundreds of millions despite resident backlash Despite an apparent majority opposi
Terafab is Fabricating? At first, I thought the video was about a data center’s infrastructure, but Terafab will be making the microchips used in data centers. Terafab needs power and water, so the infrastructure is similar, but this is X A
@Colman https://www.architecturaldigest.com/story/elon-musks-new-texas-factory-will-be-the-largest-building-on-earth-if-all-goes-according-to-plan >> “Terafab Texas will be the largest and most valuable building on Earth by far. It will be
What “terafab” means
WikipediaTerafab is a planned semiconductor fabrication plant jointly developed by Tesla, SpaceX, and Intel. The venture was announced by Elon Musk on March 21, 2026 and centers on the construction of a vertically integrated large-scale facility designed to produce more than one terawatt of artificial intelligence (AI) compute capacity per year. It aims to produce integrated circuits, memory modules and multi-chip modules under one roof by consolidating every stage of the semiconductor device production
“Terafab” on Wikipedia (CC BY-SA) →#terafab across platforms
every network with a public tag surfaceFollow #terafab straight to each platform’s own tag page. Where a platform publishes open data we measure it above; the rest lock their numbers behind paid APIs, so we link rather than guess.
Every number above is measured from a named public API at the shown fetch time. Nothing is estimated or extrapolated. Platforms that lock their data behind paid APIs are not shown. Agents: the same numbers, as JSON, at /api/hashtags/terafab